A migration that's stalled, or hasn't started because nobody's sure where to begin.
Migration and modernization planned so workloads move with a plan, not a scramble.
What Migration & Modernization covers
Migration & Modernization covers moving and modernizing workloads — from on-prem, between clouds, or from legacy architecture to something maintainable — with a real plan instead of a stalled effort nobody owns. The target platform's tooling differs, but a migration without a plan fails the same way regardless of destination.
How we deliver this on Microsoft Azure
The detail below is Azure-specific. As other platforms come online, this same page will show the equivalent approach for whichever platform you select.
Azure Migrate, Azure Arc, and application modernization planned so on-prem workloads move to Azure with a plan, not a scramble.
This is likely relevant if…
New solution, or fix what you have
Tell us which situation you're in — the consultation is scoped differently depending on the answer.
Nothing's in place yet
You haven't started migrating yet and need a plan before moving anything.
- Full on-prem inventory and dependency mapping via Azure Migrate
- Migration wave plan sequencing workloads by risk and readiness
- Modernization candidates identified versus straight lift-and-shift
Something exists but isn't working
A migration is underway or stalled, and needs to get back on track.
- Audit of migration progress and blockers to date
- Re-sequencing of remaining migration waves
- Azure Arc extension for hybrid management where useful
What's included in the Migration & Modernization consultation
- On-prem inventory and dependency assessment via Azure Migrate
- Migration wave planning sequenced by risk and readiness
- Lift-and-shift vs. modernization recommendation per workload
- Azure Arc suitability review for hybrid management
- Cutover and rollback plan for each wave
- Cost comparison — current on-prem vs. projected Azure spend
- Written migration roadmap with milestones
- 30-minute walkthrough call to review findings
Related Azure domains
How we deliver this on AWS
The detail below is AWS-specific. As other platforms come online, this same page will show the equivalent approach for whichever platform you select.
Migration Hub, Application Migration Service (MGN), DMS, and App2Container used to move workloads without a chaotic cutover weekend.
This is likely relevant if…
New solution, or fix what you have
Tell us which situation you're in — the consultation is scoped differently depending on the answer.
Nothing's in place yet
You're setting up a new environment and want this built in from the start.
- Migration Hub-tracked plan built before the first workload moves
- MGN or DMS pilot run on a low-risk workload first to validate the approach
- Application Modernization roadmap scoped alongside the migration
Something exists but isn't working
It's in place but isn't configured well enough to trust, or isn't monitored.
- Stalled migration reassessed and re-scoped with a realistic timeline
- MGN/DMS cutover tested end to end before the real move
- Post-migration validation checklist built and run
What's included in the Migration & Modernization consultation
- Migration Hub-tracked migration plan
- MGN or DMS pilot and cutover run
- Application Modernization scoping
- Post-migration validation checklist
- Rollback plan for the cutover window
- Written report with prioritized recommendations
- 30-minute walkthrough call to review findings
Related AWS domains
How we deliver this on VMware
The detail below is VMware-specific. As other platforms come online, this same page will show the equivalent approach for whichever platform you select.
vMotion-based migration, P2V conversion, and application modernization planned so workloads move without a chaotic cutover weekend.
This is likely relevant if…
New solution, or fix what you have
Tell us which situation you're in — the consultation is scoped differently depending on the answer.
Nothing's in place yet
You're setting up a new environment and want this built in from the start.
- Migration plan built and tested before the first workload moves
- P2V conversion piloted on a low-risk workload first
- Modernization roadmap scoped alongside the migration
Something exists but isn't working
It's in place but isn't configured well enough to trust, or isn't monitored.
- Stalled migration reassessed and re-scoped with a realistic timeline
- P2V cutover tested end to end before the real move
- Post-migration validation checklist built and run
What's included in the Migration & Modernization consultation
- Migration plan and timeline
- P2V conversion pilot and cutover run
- Application modernization scoping
- Post-migration validation checklist
- Rollback plan for the cutover window
- Written report with prioritized recommendations
- 30-minute walkthrough call to review findings
Related VMware domains
Ready to talk about Migration & Modernization?
Describe what's happening — we'll follow up with a scoped consultation quote within 2-3 business days.